CertBenchTrade Exam Manual

EPA 608 HVAC — Interactive Formula Workbench & Cheat Sheet

Enter your own problem numbers to see every step of the math—not just a final answer.

Practice Word Problems →

EPA 608 Annualized Leak Rate Calculator (40 CFR § 82.157)

Calculated Annual Leak Rate
27.0% / year
EXCEEDS 20% — 30-DAY REPAIR REQUIRED
Step-by-step: (8 ÷ 120) × (365 ÷ 90) × 100 = 27.04%

EPA 608 Required Evacuation Vacuum Lookup (Table 1)

Post-Nov 15, 1993 Equipment (Most Tested)
15 inHg vacuum
Pre-Nov 15, 1993 Legacy Equipment
4 inHg vacuum

High-pressure appliances other than R-22 holding 200 lbs or more.

Exam Formula Reference Sheet (EPA-608)

Annualized Leak Rate Formula (40 CFR § 82.157)

Leak Rate (%) = (lbs Added ÷ Full Charge lbs) × (365 ÷ Days Since Last Add) × 100
  • • lbs Added = pounds of refrigerant added during the service call
  • • Full Charge = normal full operating charge of the appliance (lbs)
  • • Days Since Last Add = calendar days elapsed since previous refrigerant addition (use 365 if first addition in a year)
Worked Example: A 100-lb commercial rack receives 8 lbs after 90 days: (8 ÷ 100) × (365 ÷ 90) × 100 = 32.4% → Exceeds the 20% commercial limit! Repair required within 30 days.
Exam Trap Tip: Watch the trigger thresholds: 10% Comfort Cooling, 20% Commercial Refrigeration, 30% Industrial Process Refrigeration.

EPA Section 608 Required Evacuation Levels (Post-Nov 15, 1993 Equipment)

Appliance TypeCharge SizeRequired Vacuum (Post-1993)
HCFC-22 (R-22) Appliance< 200 lbs0 psig
HCFC-22 (R-22) Appliance≥ 200 lbs10 inHg vacuum
Other High-Pressure (R-410A, R-404A, R-134a)< 200 lbs10 inHg vacuum
Other High-Pressure (R-410A, R-404A, R-134a)≥ 200 lbs15 inHg vacuum
Very High-Pressure (R-13, R-503)Any size0 psig
Low-Pressure Chiller (R-123, R-11)Any size25 mmHg absolute

Annual Leak Repair Trigger Thresholds (Appliances ≥ 50 lbs)

Equipment CategoryMax Annual Leak RateRepair Window
Comfort Cooling (HVAC)10%30 days
Commercial Refrigeration20%30 days
Industrial Process Refrigeration (IPR)30%30 days (120 days if industrial shutdown required)